Determination of Production Targets on Sewing for the Front Body of H&M Pajamas Jogger Pants

  • Afriani Kusumadewi STT Tekstil Bandung
  • Filly Pravitasari Universitas Insan Cendekia Mandiri
  • Feny Nurherawati Universitas Insan Cendekia Mandiri
Keywords: skill, output, fatigue

Abstract

The process of sewing the front body of an order for H&M Pajamas Jogger Pants has a fairly high quality, but the target for setting production targets is based on experience and estimates only. The setting of a fairly high production target of 640 pcs/day is often not achieved because the determination of the production target is not based on the level of difficulty of the work carried out by the operator (easy, medium, or difficult), the operator's skill as well as the condition of the machine used in the process. condition is good or not, so that the target set is often not achieved because it is not in accordance with the condition of the operator's ability in general. Based on the observation of the operator's working time measurement, the total standard time for the 26 manufacturing processes for the front body component of the order of H&M Pajamas Jogger Pants was 23,029 minutes. After getting the total standard time for making the front body component of the order for these H&M Pajamas Jogger Pants, a new production target can be determined, which is 542 pcs/day. This new production target is made to represent the general working conditions of operators and has taken into account the factors of slack, work fatigue and other unavoidable obstacles.

References

A. S. Mariawati. (2019). “Pengukuran Waktu Baku Pelayanan Obat Bebas Pada Pekerjaan Kefarmasian Di Apotek CT,” J. Ind. Serv., vol. 5, no.1, pp. 1–3, 2019, doi: 10.36055/jiss.v5i1.6491.
A.Y. Pradana dan F. Pulansari. (2021). “Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi di PT. XYZ,” JUMINTEN, Vol. 2, No. 1, pp. 13–24, Jan. 2021
Bhagya, TG., Prakarsa, G. (2020). Model Keputusan Penentun Jenis Distribusi dam Kerusakan Bearing pada Mesin TFO di PT. XYZ. SisInfo, 134-142.
Bridger, R.S. (1995). Introduction To Ergonomic. Singapore: McGraw-Hill Bookco.
D. Septiyana. (2019). “Evaluasi Pengukuran Waktu Kerja Dengan Metode Time Motion Study Pada Divisi Final Inspection PT. Gajah Tunggal Tbk,” Jurnal Teknik, vol. 8, no. 1, 2019, doi: 10.31000/jt.v8i1.1592.
E. Nugraha and R. M. Sari. (2018). “Penentuan Waktu Proses Pembuatan Kain dengan Pendekatan Cross-Case pada Industri Tekstil,” Organum: Jurnal Saintifik Manajemen dan Akuntansi, vol. 1, no. 1, pp. 27–31, Jun. 2018, doi: 10.35138/organum.v1i1.28.
H. C. Suroso and Yulvito. (2020). “Analisa Pengukuruan Waktu Kerja Guna Menentukan Jumlah Karyawan Packer di PT. Sinarmas Tbk,” J. IPTEK, vol. 24, no. 1, pp. 67–74, 2020, doi:10.31284/j.iptek.2020.v24i1.906.
H. Ponda, J. Hardono, dan S. K. Pikri. (2019). “Analisa Keseimbangan Lintasan Produksi Pada Pembuatan Radiator Mitsubishi PS 220 Dengan Metode Ranked Positional Weight (RPW),”Journal Industrial Manufacturing, vol. 4, no. 1, pp. 77–92, Jan. 2019, doi:10.31000/jim.v4i1.1251.
M. Priyo and M. R. A. Paridi. (2018). “Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor),” Semesta Teknika, vol. 21, no. 1, pp. 72–84, May 2018, doi: 10.18196/st.211213.
M. Zulkifli. (2020). “Analisis Data Kuantitatif “Efekitivitas Metode Graphomotor Terhadap Kemampuan Menulis Peserta Didik”,” Al-Mujahidah, vol. 1, no. 2, pp. 104–117, Oct. 2020, doi: 10.51806/al- mujahidah.v1i2.15.
N. Kartika, S. M. Robial, and A. Pratama. (2021). “Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi,” Jurnal Momen Teknik Sipil, vol. 3, no. 2, pp. 103–112, 2021, doi: 10.35194/momen.v3i2.1207.
N. Saibani, A. A. Muhamed, M. F. Maliami, and R. Ahmad. (2015). “Time and Motion Studies of Manual Harvesting Methods for Oil Palm Fruit Bunches: A Malaysian case study,” Jurnal Teknologi, vol. 74, no. 3, May 2015, doi: 10.11113/jt.v74.4555.
Nurmianto, Eko. (1996). Ergonomi: Konsep Dasar dan Aplikasinya. Surabaya: Guna Widya.
Published
2022-09-28
Section
Articles